The console will be tied to frame 6 with fiberglass tape and at the keelson with screws. I did not want to compromise the frame strength. Plates are mounted with butyl tape beneath screws. There are 6 control positions, main sheet and compass.
Floor framing dragged ab it but 2 more days should get them all ready and mounted short of a final paint or epoxy...tbd.
Buoyancy bags were fitted with three in front and three in aft. Need containment net tie downs then this is done/ready.
Floor framing dragged ab it but 2 more days should get them all ready and mounted short of a final paint or epoxy...tbd.
Buoyancy bags were fitted with three in front and three in aft. Need containment net tie downs then this is done/ready.
Update on outstanding tasks:
Spinn. chuteBuoyancy- Bow
- Deck, mast gate
- Console 95%
- Flooring 90%
- Rudder 95%
- Mast step
- Fore and aft ram assembly
- Fittings
- Keel mount
- cockpit finishing 50%
- Hull mods for cleats, splash guard, shear strip installation, s
hroud attach,cheek block aft spinnaker - paint
- Build support structure
- Support boat in cradle
- proceed with keel work
- install to trailer
- Trailer
- mast rig
- Fit out