Tuesday, February 18, 2014

More of the same.  Lots of scarf and glue.  The glue bench could use an upgrade but so far everything is straight.  Maybe two weeks before a real layup is possible.  It would be nice to do A-E sections.  I revised the laminate sheet and I am considering steaming the length of the laminates from the stem to section 3 then drying them in the form jig.   The 10 mm sections take the curve but one cracked at section 2.  With six or seven layers I dont want to blow it up.



No comments: