More of the same. Lots of scarf and glue. The glue bench could use an upgrade but so far everything is straight. Maybe two weeks before a real layup is possible. It would be nice to do A-E sections. I revised the laminate sheet and I am considering steaming the length of the laminates from the stem to section 3 then drying them in the form jig. The 10 mm sections take the curve but one cracked at section 2. With six or seven layers I dont want to blow it up.
No comments:
Post a Comment