The hull has been aligned and offsets along center line checked with laser baseline from transom to stem.  The station beam widths were checked and adjusted with ropes to match the loft table.  Frames can now be fitted to this 'expected' shape and the jig for frames is ready.
 

 

Building a jig for frame laminates at mid section.  I had not planned to use marine ply for the frames but I acquired 4mm and 12mm for internal construction and I still have several 3mm sheets available.










A saw blade cleaned up the interior surface staple damage followed with orbital sanding all over.  A first coat of slightly thickened epoxy has been added followed by a very thick milled glass fiber epoxy to fillet between hull skin and keelson. 