Monday, January 4, 2016

A few steps to go for 2016 with hardware and rigging orders underway.
  1. Spinn. chute
  2. Buoyancy
  3. Bow
  4. Deck, mast gate.
  5. Hull mods for cheek and cleats, splash guard, shear strip installation, shroud attach, cheek block aft spinnaker
  6. Console
  7. Flooring
  8. Rudder
  9. Mast step
  10. Fore and aft ram assembly
  11. Fittings
  12. Keel
  13. cockpit finishing
  14. paint
  15. Lift
  16. Build support structure
  17. Support boat in cradle
  18. proceed with keel work
  19. install to trailer.
  20. Trailer 
  21. mast rig
  22. Fit out
  23. Last but not least...the Details.
This section interfered with hull and is flattened out.  Added stiffening to perimeter and preparing to fare internal surfaces.  Straight extension will continue from rectangular flange back to cockpit.





 Mast gate aft plate with ff logo and sail number.  Hopefully we can cast this in aluminum.