Friday, August 19, 2016

Final cleanup steps proceeding.  Dumped mast gate casting for now and using plug.



Hawaii island kiwi fruit?


Placed an aluminum tube through the breakwater for the furler line control.


Cover box for compass from leftover scraps.




Sunday, August 14, 2016

So flying fifteen 4034 has sailed.  We have a boat ramp that is above a bridge so it is necessary to paddle out beyond the bridge then setup the rig.  This took time but a strong group from the Hilo Sailing club made it all happen.  And the boat was christened by the esteemed Chris Bridges prior to hitting the water.  The weather was typical east Hawaii but with some squalls.  In the hands of two advanced sailors who were confident the boat would not falter she was put to the line.  Time to learn about Tuning Guides.





 The jib halyard slipped out of the mast (very quietly) so we reinserted it using the bridge.

The quiet before the storm.

These clouds brought in some strong winds.

Friday, August 12, 2016

We should be in the water in 12 hours.  Finishing up enough items on the boat to launch and sail with out bizarre boat ramp and bridge obstacle.   I am not sure how the wind vane normally attaches to the top of the Selden mast so made a bracket for that.  Console is tied down, vang lines are 90%.

Sealant and wood screws at front legs then cord wrapped at arches with some sealant between.
A bungee is added around top of console to catch control line ends.
Wind vane bracket.



 Compass, lines and console ready.  Probably need a divider at each pair of control lines.

Wont have a gate this time around...and not quite sure how well any of this is going to work.  The ocean waits.

Saturday, August 6, 2016

Starting out early the boat was readied for the trip to the sea.  We drop 2000' in about 5 miles so there are some good grades.  The trailer handled beautifully and was very steady.  At the water the mast was put up.  We set about installing the final wire link for the rig tension system and found the mast fore ram was weak at 2:1.  Modified to 3:1 and we could then put a nice curve in the mast.  The console looks as though it will work out with a few mods and additions.  Jib cleats need to to be moved up and new vang routing installed.

The sails and lines were all setup and an approximate line layout complete.  This will be cleaned up and then the boat will be ready in one week for launching in the harbor on the 12th.  Looks like it is going to be fast!

Ready to roll.
Sails up.  Mac and Richard reviewing the setup.
 Take down and packing up.




Friday, August 5, 2016

Tomorrow the boat makes its way to the waterfront for some checkout of sails, lines, etc.  This will be a dry run before sailing on the 12th of August.  Seems the major work is done, now tuning, tuning...

Here the mast gate cap is cast.  The furnace was not insulated enough so the pour was lacking.  It will work for now and later a better plate can be setup.
 

Marking sheave position for console.

 Plate ready for tap.

Wednesday, August 3, 2016

4034 documents:

--FF International documents and rules link:

http://www.flying15.org/documents-and-rules

--Hull general (drawings incomplete to actual construction):
https://drive.google.com/open?id=0B5QbRyzKX1QyXzFJYVdXWEdsTGM

--Rope schedule:
https://drive.google.com/open?id=0B5QbRyzKX1QybEJwVHMyNG9iUkU

--Fit-out schematics initial release

  Hardware schedule:
https://drive.google.com/open?id=0B5QbRyzKX1QyN19sU3VSWHlWbWc

  Ram:
https://drive.google.com/open?id=0B5QbRyzKX1QyWVZvUVRzSDYzU28

  Main:
https://drive.google.com/open?id=0B5QbRyzKX1QyUUp0TGNsU1VKYTg

  Spinnaker:
https://drive.google.com/open?id=0B5QbRyzKX1QyNVA2UUpWcXJlOU0

  Genoa:
https://drive.google.com/open?id=0B5QbRyzKX1QyY3YtUktfdTd2YW8


--Trailer:
xxxx



Finished boat name stenciling and general rope layout.  The vang was to originally hang off the back side of the console (Barney?).  I will leave it in a temporary state until more hardware can be purchased to allow control on each side and behind the plinths.  Plan currently is a checkout down by the sea on 8-5-16 then sail on 8-12-16.