Finished boat name stenciling and general rope layout. The vang was to originally hang off the back side of the console (Barney?). I will leave it in a temporary state until more hardware can be purchased to allow control on each side and behind the plinths. Plan currently is a checkout down by the sea on 8-5-16 then sail on 8-12-16.
No comments:
Post a Comment