Monday, February 9, 2015

Two coats of epoxy have been added over hull with sanding and microlite filler on the second coat.  The surface is now adequte for the next layer. I started cutting up finer 1088 marine ply into strips and wetted one side with epoxy coating.  The strapping is ready so the first slat is about to go on.  This is going to be a lot of work!







 
A few notes on staples and guns.  I mentinoned earlier in a post I used Arrow, Dewalt, Powermatic, and Stanley staplers.  I know none of these are air powered so you could do better.  To the point the Dewalt DWHTTR350 has performed the best.  The first unit actually failed after several days.  The hammer gripper would no longer lift the hammer spring.  Traded for a new one and it is going fine.  You must keep the pusher blade free of epoxy or make sure it is not glued before you start.  Its the least fiddley changing staples (palm and your forearm) and gives the most consistent drive.  The neighbors have not complained past 8pm with 40 bangs per ply.  I tried two electric staplers and they had less power than any of the manual units.  There are better industrial units that are electic.  The Dewalt is very well built, can be unassembled and reassembled.  Stick with the Dewalt or Arrow staples.  Stanley staples hung up.  The Arrow had problems with loading staples when the glue is hot and stress is high.  It would catch and break the row into two parts.
 
The 4-1 Dewalt stapler 410 had issues.  The high power was nice but it hung up.
The Powershot Pro and Stanley 2-1 electric were useless for this work.  Simply not enough power to drive 10 thru 15 mm staples thru ply and stringers.  They also tended to deform the heads of the staples.  Otherwise they functioned.
 
The pictures show the 4 units and various staples lengths, all T50.  Some braids are in the lower left and no issues there.   
 
 
Covered strap with poly.  System seems to work well, time to turn on the heat.
 
 



 

Monday, February 2, 2015

Decided to pull out all of the edge staples and replace with brads.  They sink flush with the skin but can still be remmoved prior to covering with the next layer.  This makes it much easier ot get the sanding down to the shear.  Tried hot glue but it would not hold the skin to the shear beam.  Added a first layer of epoxy on the port aft section. 



Friday, January 30, 2015

After many hours of pulling staples except along the shear the hull surface is sanded to take off high spots without digging too deep into the ply.  I will set up the strapping at the mid section for about 1/3 of the length overall.  The plys lay very nicely and should not require much strap force.  The straps will have to be covered over with polyethylene and able to shift positions easily.  Planned sequence so far:
-- sand 1/3 areas
-- fill pores and gaps and seal entire surface
-- fair  surface with microlight 410(not perfectly but to lessen the volume between layers)
-- add second layer strips in sets of 3-4 after spilling, fitting dry, then giving initial coat of epoxy.

Some day in the distant future:

-- Complete second layer, remove staples, cure epoxy, wipe amine, and sand all over.
-- Add layer of 10oz e-glass
-- Paint epoxy primer, Interlux 2000e or similar
-- Paint finish coat such as Valspar or similar

Get on with it!!






Thursday, January 15, 2015


Monday 1-19:  First cold mould layer is finished.  The tight bends are satisfactory.  It would have been worth the extra time to bend the strips in this region a bit more.  The next layer will get more attention to this detail. 
The next layer will be higher quality marine ply (Joubert 1088 okume) although I would not hesitate to use this lesser grade ply throughout.  I will build up a strapping system, remove staples, prep all over then start the next layer.  Not sure if I will work one area at a time and progress fore aft or sand all over, coat with a layer of epoxy then start laying as before.  Epoxy use is going to increase so time for another gallon.






Thursday:  Two more panels snapped when I set them up so I soaked them a bit and laid them in the sun.  After a while I could set them on the mold fairly easily.  I will let them dry out then do the fit work and glue up.


A strip panel snapped yesterday and another today while I tried to put it in place.  The turn is getting tight around the hull in the back section.  Here are some pictures on the stripping method:  Space next to previous strip, lay flat while twisting, clamp, scribe, plane to line, plane a bevel below the cut line, sand all sharp edges, fit.  I tried 5 strips stapled in place then a fast glue on all 5 but it is not much gain from doing a strip, gluing, doing another strip and less stress.  One more day and the first layer should be wrapped up.







Wednesday, December 31, 2014

Snow on Mauna Kea after last night's wind storm.
 Fastened the the shear beams to the stem in preparation to finish up front panels.  Few more days and layer one should be in place.




















Moving right along the strip and spilling is much easier towards the bow as opposed to the aft sections that have the tight turn.  It will likely get more difficult to keep the boards behaving towards the transom.  Some long hypodermic needles arrived so I was able to fill glue inside a void in the keelson.  The aft planking will now continue.  It was held up waiting for that task to be complete.

The staple guns have been acting up.  I really like the Dewalt stapler as it has a powerful hammer and pounds 9/16" staples all the way through the keelson.  It is easy to load but the first one I bought failed after ~ 1000 staples.  The release mechanism appeared to have worn and would not lift the spring anymore accept every 3-4 attempts, enough to drive you nuts.  There is a lifetime warranty so I shelved it, bought another and picked up a 5k staple box of 10mm T50s.  I also bought an electric Stanley and will try it tomorrow.  The Dewalt is beautifully built and feels tough.  The release mechanism parts are hardened steel so it is troubling as to what the root issue is.  It takes getting used to as the staple exit is not close to the edge so you need to develop a fell for where to place the gun.






Attached transom at the keelson  without issue.          I figured I would hold off until the molding was 50%.  Stripped two more sheets of ply into planks.  This will be enough to finish the first layer of ply. Here is the hole at the laminate void. I am not worried about voids as the boat stays out of the water.

Wednesday, December 17, 2014

Scarf tool for 3mm marine ply sheets.  I will use this to build up 8 more strips then cut up a new 4x8 sheet tomorrow.   

Wednesday, December 3, 2014

Last time the keelson will be out alone.  Put a coat of epoxy all over.

Keelson now mounted and strapped in place with metal gussets.  Added some plastic sheets over the mold and preparing for laying ply.

Started the skin installation.  Takes a bit of finesse to lay these down flat but the process is getting smoother.  The strips are continuously twisting as they lay down and the slightest error lifts one edge or the other.  The form is not perfect so takes a bit of care to stay on a fare line.  At the sheer the strips are clamped and stapled but not glued.  As the second layer comes along I will remove only the staples required.  Wondering how much spring back there will be but that is certainly a long way off, this is slow going.  Work should require approximately 280 strips, 4 strips / hour, 7 ml epoxy / strip. Staple gun noise limits work to before 8pm :(   Using 5/8" brads and 12 mm heavy duty T50 staples. Arrow stapler is pretty good, Powerone stapler was weaker than the arrow, and a Dewalt is working pretty well after taking back the first one I bought.  It would not pass staples.  Plan to put together a scarfing jig to make more strips with the leftovers tomorrow.