Using drill and router a pit was cut in the hog to a depth of 48 mm and the mast step put in place temporarily. We adjusted the spreaders according to the Goacher tuning guide although I am running an Alto and not and Epsilon mast, then we raised the mast and checked the shroud attachments. The attachment plates were drilled and installed to the deck. All looks pretty good. It would be nice to do something about the bolts sticking up, perhaps sink them flush.
No comments:
Post a Comment