Wednesday, May 18, 2016

OK...I had nothing to do with the 'Flying Mint Bunny' in the video bar.   Don't watch unless you are pint in.

Wednesday, May 11, 2016

The boat is flipped and getting prepped for some paint.
The sails and mast are floating out in the Pacific headed this way and the trailer is up next. Sand...sand...sand...not to perfection but good enough to paint Saturday...

Chapter 2:  here is a wrap up since last May till now of hull internal work.





Cutting up steel for welding next week.
Keel bolt holes ready.

Sunday, May 8, 2016

As mentioned way back when the keel arrived from California a 1/2" twist in the keel profile with respect to the flange was discovered.  I averaged the error between the flange and the center-line of the profile.  The flange as well is flat whereas the keelson profile is not.  That was missed in the casting plug.  The holes were transferred from the keel to the hull and after the hull is finished the keel will be installed and the gap filled with epoxy.

The hull has been flipped with a little pain.  Moving on with prepping surface for paint, drilling keel holes.

























Thursday, May 5, 2016

Modified the base to simplify alignment and fitting of keel.  The mismatched keelson and keel flange surfaces are going to be a challenge to mate.  This could be an epoxy gap fill job.






Tuesday, May 3, 2016

Here a final coat of epoxy has been applied.   The keel installation (hole marking and cutting) and bottom preparation follows.  Then bottom painting and back upright to finish top, mount keel and drop onto trailer.

Moved base and setting upgantry to lift hull.  I hope to modify the base to allow the keel underneath for alignment but to also remain as back up support.  Here is the boat launch, trailer and metal for the trailer.





Thursday, April 28, 2016

At this point the primary woodwork is done.  More epoxy coating and fairing on deck surface is needed as well as sealing exposed wood at new block cutouts.  Many loose ends to dwell on but the boat will now be aligned with the keel and profiled.  The original casting plug has an error in the top flange.  It is flat but should have a slight curve to follow the keelson profile.  Some cut and fill will occur at the keelson once it is flipped but for now the holes can be transferred.  






Tuesday, April 26, 2016


Mounted breakwater.  This will be followed with additional faring.  Next up is modifying mast gate area and aft deck for several thru deck blocks.  That should finish the pre-paint woodwork.  Not to  happy with the floor boards, different topic but it is going to require some boat shoes or the like to make it comfortable. Perhaps an attached plate would do but that is another day.

Received hub bearings.