Two coats of paint applied, all went quite well. Really happy with finish!! Used Valspar LIC 40, a 2 part linear polyurethane with 4:1 ratio mix to hardener. About 26 oz. covers entire hull. Recommend doing several small batches and working when boat surface is cool and dry. We started with a cool morning with rising temperature. Scattered light with a clouded sky put enough insolation on hull surface to warm up so curtain was in place during work. This paint when it hits warms surfaces can be shocked to catalyze much faster and impacting the roll/tip painting ease. Sanded all over with orbital and final at 120. Cleaned with lacquer thinner. After one day dry re-sanded lightly to take off bumps and bugs etc. Roll paint in 3ft^2 area then brush with fine hair brush. Amazing. Cleaning off spinnaker chute from chicken drops.
Too much rain today to paint the hull so onward with trailer frame. Applied some primer although there is still welding to finish. Hoping for some sun tomorrow.
Light and plates mounting.
Sunday, May 22, 2016
Friday, May 20, 2016
Wednesday, May 18, 2016
Wednesday, May 11, 2016
The boat is flipped and getting prepped for some paint.
The sails and mast are floating out in the Pacific headed this way and the trailer is up next. Sand...sand...sand...not to perfection but good enough to paint Saturday...
Chapter 2: here is a wrap up since last May till now of hull internal work.
Cutting up steel for welding next week.
Keel bolt holes ready.

The sails and mast are floating out in the Pacific headed this way and the trailer is up next. Sand...sand...sand...not to perfection but good enough to paint Saturday...
Chapter 2: here is a wrap up since last May till now of hull internal work.
Cutting up steel for welding next week.
Keel bolt holes ready.
Sunday, May 8, 2016
As mentioned way back when the keel arrived from California a 1/2" twist in the keel profile with respect to the flange was discovered. I averaged the error between the flange and the center-line of the profile. The flange as well is flat whereas the keelson profile is not. That was missed in the casting plug. The holes were transferred from the keel to the hull and after the hull is finished the keel will be installed and the gap filled with epoxy.
The hull has been flipped with a little pain. Moving on with prepping surface for paint, drilling keel holes.



The hull has been flipped with a little pain. Moving on with prepping surface for paint, drilling keel holes.
Thursday, May 5, 2016
Tuesday, May 3, 2016
Here a final coat of epoxy has been applied. The keel installation (hole marking and cutting) and bottom preparation follows. Then bottom painting and back upright to finish top, mount keel and drop onto trailer.
Moved base and setting upgantry to lift hull. I hope to modify the base to allow the keel underneath for alignment but to also remain as back up support. Here is the boat launch, trailer and metal for the trailer.


Moved base and setting upgantry to lift hull. I hope to modify the base to allow the keel underneath for alignment but to also remain as back up support. Here is the boat launch, trailer and metal for the trailer.