Sunday, May 29, 2016

Painted frame with Ace Rust Stop and primer and waiting for cure.  Will install axles, wheels, lights, jack, winch, etc. and take it down town for inspection, weighing.  I re-leveled the hull to the baseline then leveled it transverse as well.  With a laser marked off waterline at 381mm above baseline (+/-) then 401mm above baseline.  Marked with pen and taped off.  Need to figure what paint to go with for waterline and deck stripe.





 This is really easy to do!
 Weld checking.

No comments: