Saturday, July 30, 2016

This shows a substitute mast and boom with locations of attachment marked out for control lines.  It is working well for layout of lines.  The mast ram keelson plate was replaced with the existing bolt plate, removed, tapped and reinstalled.  Lines for Cunningham, ram fore/aft, Vang, and rig tension are laid out.  Several more lines pass through to the console: Barber hauler will route beneath the floor from either side, Spin. pole uphaul from bottom of mast, spinnaker halyard and downhaul.

The keelson area between the mast and console probably needs a cover as well as protection from the bolts.  Not sure where this will go yet.  The rig tension white line is temporary to be replaced with 1/8" wire.



Genoa pintel sheet metal.




Stencil cutting for boat name on transom.


No comments: